- September 26, 2023
- dakfab.com
- 5:45 pm
Difficulty Level
Tube Bending
90%
Request:
A bi-level foundation was made to separate a pool area and fire pit area. Handrails were needed for each stairway access that could hold up the elements and provide safety.
Design:
We modeled the foundation in 3D and took appropriate measurements’ that will adhere to safety standards. The handrails were 3D Modeled and utilized for blueprints.
Fabrication:
These hand rails were mandrel bent from 1.75 OD x .120 WA tubing and welded together using a temporary JIG fixture.
Designed with ends that anchor into poured concrete.
